Saturday 03 May 2025

MDA condemns abuse in irresponsible work from people’s money at Mater Dei

The Malta Developers Association (MDA) notes the enquiry report on the provision of concrete that was not of an acceptable level in the building of Mater Dei Hospital.

The MDA condemns the actions of all those who failed to fulfil their obligations in the building of this hospital, which even took a large number of years to be built and cost the Maltese people more than €600,000,000. Even more so because this means that the money from people’s taxes was abused.
The MDA appeals for the necessary steps to be taken against anyone who can be held responsible without any reservations.

Powered By9H Digital